Reinjection-grade produced water — guaranteed.

Reservoir pressure maintenance and EOR depend on injection water that won't plug the formation. WFS modular PWRI trains remove oil and solids to injection spec — and hold it — across the life of the field.

WFS produced-water reinjection treatment train, from three-phase separation through ultrafiltration and injection pumps
WFS produced-water reinjection treatment train (targets shown are treated-water quality specs in mg/L).

Guaranteed treated-water quality

ParameterWFS guaranteeWhy it matters
Oil-in-water (OIW)< 5 ppmPrevents near-wellbore oil plugging
Total suspended solids< 2 ppmProtects formation permeability
Silt Density Index (SDI)< 3Key injectivity indicator for tight/clastic reservoirs
Dissolved oxygenLow-DO designControls corrosion & reservoir souring

WFS modular PWRI treats produced water for a fraction of the cost of conventional plants. Request a tailored cost-to-treat estimate for your flow and water chemistry.

Get my estimate

Where it fits

  • Mature GCC & Iraq fields with rising water cut — Ghawar, Rumaila, Upper Zakum, Greater Burgan.
  • Central water-injection plants and gathering-centre de-oiling upgrades.
  • Available as a permanent plant, a rental skid, or under a BOO/BOOT tariff.

Get a Cost-to-Treat Estimate

Share your water chemistry, flow rate and discharge spec — our engineers scope a treatment train and return a tailored, confidential estimate for your site.